Entries by Steve Griffin

Everybody Said Yes to Something They Were Unsure Of

Electrical contractor learning to handle an unfamiliar industrial project

Everybody Said Yes to Something They Were Unsure Of

EVERYBODY HAS A FIRST — CHAPTER 13

I have learned something important throughout my more than 50 years in the electrical contracting business: some of the biggest opportunities in life begin when you agree to do something you have never done before.

That does not mean saying yes to every job without thinking. It means recognizing that growth often requires stepping outside your comfort zone, asking questions, and being willing to learn. I have experienced this firsthand, and one particular project taught me a lesson I have never forgotten.

It is a lesson I also share in my book, Everybody Has A First. Every electrician, electrical estimator, and contractor has a first time doing something unfamiliar. What matters is how we approach that challenge.

The Estimate That Opened an Unexpected Door

I was working on an industrial lighting estimate when an opportunity came along that was outside my usual experience. The project involved more than simply installing electrical equipment. It eventually led to building an industrial control panel, something I had never built before.

I could have said no. I could have told myself that I did not have the experience and that somebody else would be better suited for the job. Instead, I agreed to take it on.

I did not say yes because I already knew everything. I said yes because I believed I could learn what I needed to know and find a way to get the job done.

That decision led me into unfamiliar territory. I had to work with engineering drawings from Sweden, understand how the panel was supposed to operate, and figure out how to turn those drawings into a working piece of equipment.

There is a big difference between looking at something on paper and building it in the real world. An electrical contractor has to bridge that gap every day.

Learning by Building Something New

Once I committed to the project, I had to work out how to build the control panel. I arranged a temporary panel-building area and began figuring out the tools, materials, layout, and assembly process needed to complete the work.

I did not have a ready-made solution for every problem. I had to improvise, think through unfamiliar details, and keep moving forward without pretending I knew more than I did.

That experience reinforced an important lesson for me: confidence does not mean having every answer before you begin. Sometimes confidence means believing you can work through the questions as they arise.

In electrical contracting, we regularly face plans, equipment, and job conditions that are different from anything we have handled before. A good electrical estimator needs to recognize the difference between an unfamiliar task that can be researched and understood and a task that requires expertise or resources the company does not have.

I believe in taking on challenges, but I also believe in being responsible. If I need technical guidance, I seek it. If I need to learn a new process, I study it. If I make a mistake, I work to understand what went wrong.

That is how experience grows.

When the Panel Would Not Work

After all the effort that went into building the panel, the moment finally arrived to start it up. I expected the equipment to work, but it did not operate as it should.

It is frustrating to reach the end of a difficult project and discover that something is wrong. You begin reviewing what you have done, checking the wiring, and trying to identify the problem. The drawings may look clear to you, yet something in your interpretation may not match the designer’s intention.

That was the situation I faced.

The engineering drawings were from Sweden, and I had misunderstood part of the panel’s labeling and arrangement. The instructions used directional terms corresponding to right, center, and left, and I had interpreted those labels incorrectly.

The problem was not simply that I could not build the panel. I had made an assumption about the drawings that turned out to be wrong.

I needed to get to the bottom of it.

Asking the Right Person Made the Difference

Rather than continuing to guess, I sought help from the Swedish engineer who understood the design. By reviewing the issue with the person who had created the drawings, I was able to understand the intended arrangement and correct the wiring.

Once the misunderstanding was resolved, I could move forward with the necessary corrections.

That experience taught me not to confuse an assumption with a fact. Even when you have spent years in the electrical business, you can misunderstand a drawing, a label, or an instruction. Experience is valuable, but it does not make anyone immune to mistakes.

I learned to pay closer attention to unfamiliar terminology and to ask for clarification before allowing an assumption to become an expensive problem.

I would give the same advice to any electrical contractor or estimator: when something does not make sense, stop and verify it before moving forward.

A short conversation can prevent hours of rework. On a larger project, it can protect the schedule, the budget, and the relationship with the customer.

What This Taught Me About Electrical Estimating

The lesson applies just as strongly to electrical estimating as it does to panel building.

When I prepare an estimate, I may encounter unfamiliar equipment, unusual installation requirements, complicated drawings, or a scope of work that requires additional research. The easy response is to avoid the opportunity. The responsible response is to investigate it, understand the risks, and decide whether I can estimate and execute the work properly.

An electrical estimator should never treat an unknown as though it were already understood. If something is unclear, I want it identified before Bid Day, not discovered after the contract has been awarded.

Saying Yes Does Not Mean Ignoring Risk

I want to make one distinction clear: saying yes to an opportunity is not the same as blindly accepting every challenge.

Before taking on unfamiliar work, I recommend asking yourself a few questions:

The Lesson I Still Carry With Me

When I look back at that control-panel project, I do not remember it simply as a job that involved unfamiliar equipment and a difficult start-up. I remember it as a turning point in how I think about opportunities.

I learned that I did not need to know everything on the first day. I needed to be willing to learn, pay attention to the details, admit when I had misunderstood something, and ask the right person for help.

That mindset has served me throughout my electrical contracting career and in the work that eventually led me to develop estimating software.

Every new challenge offers a choice. I can allow uncertainty to make the decision for me, or I can examine the opportunity, understand the risks, and decide whether I am prepared to take the next step.

My advice is simple: do not let the fear of being inexperienced automatically close a door. Learn what you need to learn, ask questions, and take responsibility for the work you accept.

Everybody has a first. The first time may be uncomfortable, but it can also become the experience that prepares you for the next opportunity.

That is one reason I value an organized estimating process. Good Best Bid Electrical Estimating Software helps contractors organize their estimating work and develop more consistent bids. However, software cannot replace judgment, careful plan review, or the willingness to ask questions.

I also encourage estimators to understand their electrical estimating reports so they can review the information behind a bid and make informed decisions.

If you want to improve your estimating skills, structured training can also help you approach unfamiliar work more confidently. My Online Electrical Estimating School is a resource for learning and developing practical estimating knowledge.

The goal is not to pretend that every job is easy. The goal is to develop a process that helps you understand the work, identify what you do not know, and make sound decisions before committing your company.

  • Do I understand what the customer expects?
  • Can I obtain the drawings, specifications, and technical information I need?
  • Do I have the skills, people, tools, and resources to complete the work?
  • What could go wrong, and how can I reduce that risk?
  • Who can help me resolve questions that are outside my experience?
  • Have I allowed enough time and money to do the work correctly?

These questions do not have to stop you from taking an opportunity. They help you determine how to approach it responsibly.

Throughout my career, I have found that the best results come from combining the courage to try something new with the discipline to prepare properly.

That balance is important in estimating and in running an electrical contracting business. I discuss this broader principle in The Art of Balance in Electrical Estimating.

Electrical contractor and engineer reviewing control-panel wiring against an engineering schematic to identify and correct a drawing misunderstanding.

Frequently Asked Questions

Why is it important for electrical contractors to take on new challenges?

New challenges can help electrical contractors develop skills, discover better ways to work, and expand the services they can responsibly offer. The key is to prepare properly and understand the risks before committing to a project.

How should an electrical contractor handle unfamiliar equipment?

Start by reviewing the drawings, specifications, and manufacturer’s instructions. Identify unclear details, consult qualified technical professionals when necessary, and confirm the design before proceeding with installation or assembly.

What should an electrical estimator do when project drawings are unclear?

An electrical estimator should identify the uncertainty, document the question, and seek clarification from the appropriate designer, engineer, or customer representative. Guessing can lead to inaccurate pricing, missed scope, and costly rework.

Can estimating software help reduce mistakes?

Estimating software can help organize quantities, labor, materials, and reports. It supports a consistent process, but the estimator must still review the plans carefully, verify assumptions, and confirm that the estimate reflects the actual project requirements.

How can an electrical estimator improve confidence?

Confidence grows through education, practical experience, careful preparation, and learning from mistakes. Training, reviewing completed estimates, and asking experienced professionals for guidance can all help develop better judgment.

Should an electrical contractor accept a job outside their experience?

It depends on the job’s complexity, available resources, safety requirements, and access to qualified support. A contractor may be able to take on a new type of work after proper preparation, but should not accept work they cannot safely or competently deliver.

What is the main lesson of “Everybody That Has Accomplished Anything Has Said Yes to Something They Were Unsure Of”?

The main lesson is that progress often begins with a willingness to try something unfamiliar. Success does not require knowing every answer in advance; it requires preparation, sound judgment, learning, and the humility to ask for help.

Need Help With Your Electrical Estimating Process?

I know how much pressure comes with preparing an accurate estimate, meeting Bid Day deadlines, and protecting the profitability of an electrical contracting business. A consistent estimating process can help you review the work, organize your costs, and make more informed bidding decisions.

If you would like to learn more about Best Bid Electrical Estimating Software, review the available pricing options, or discuss your estimating needs, please call 800-941-7028. I encourage you to ask questions and make sure you understand the tools and resources available to support your business.

I have learned that some of the most valuable experiences begin when I am willing to step beyond what I already know. I still believe in that principle today: prepare carefully, stay curious, and never be too proud to learn something new.

Steve Griffin

Founder of Best Bid Electrical Estimating Software

Electrician • Estimator • Contractor • Author • Software Developer

From digging ditches in 1973 to creating one of the industry’s longest-running electrical estimating software systems, Steve Griffin has spent more than 50 years helping contractors win more work and make more money.

,

Material Cost Management in Electrical Estimating

Material cost management in electrical estimating





Material Cost Management in Electrical Estimating: How to Stay Profitable When Prices Move | Steve Griffin<br />


















Estimating Philosophy  ·  Series Part 13 of 30

Material Cost Management in Electrical Estimating: How to Stay Profitable When Prices Move

Copper is up. Wire prices fluctuate. Steve Griffin explains how to build material cost
volatility into your estimates without padding yourself out of jobs.

By Steve Griffin  ·  Founder, Best Bid Electrical Estimating Software
 ·  July 23, 2026  ·  8 min read

📖 Part of the Complete Series
This article is Series Part 13 of 30 in The Art of Balance in Electrical
Estimating Software
— the complete 30-section philosophy guide by Steve Griffin. Read all sections in one
place.

Section 13: The Estimator’s Workflow: A Deep Dive

Estimating is not a single action. It is a workflow — a sequence of mental and physical steps that must be
completed in the right order to produce a reliable number. Understanding this workflow is essential for
designing software that supports the estimator instead of slowing them down.

Every estimator, regardless of experience level, follows a similar pattern. The details may vary, the speed may
vary, the tools may vary, but the underlying workflow is universal. It is built on logic, habit, and necessity.

The workflow begins with orientation. The estimator opens the drawings and begins to understand the project. They look at the scope.

They look at the layout. They look at the scale. They look at the symbols.

They look at
the notes. They look at the specifications. They look at the details.

They look at the structure.

Orientation is not about counting. Orientation is about understanding.

The estimator must understand what the project is before they can understand what the project costs.

The workflow then moves to identification. The estimator identifies the major systems. Lighting.

Power. Distribution. Equipment.

Special systems. Controls. Fire alarm.

Communications. Site lighting. Underground.

Conduit runs. Feeder routes.

Identification is not about detail. Identification is about structure.

The estimator must understand the major components before they can understand the minor components.

The workflow then moves to segmentation. The estimator breaks the project into manageable parts. Rooms.

Areas. Floors. Wings.

Zones. Systems. Subsystems.

Categories. Assemblies.

Segmentation is not about counting. Segmentation is about organization.

The estimator must organize the project before they can quantify the project.

The workflow then moves to quantification. This is where the estimator begins counting. Fixtures.

Devices. Panels. Transformers.

Disconnects. Receptacles. Switches.

Conduit. Wire. Supports.

Boxes. Covers. Connectors.

Materials.

Quantification is not about perfection. Quantification is about accuracy.

The estimator must count what matters — not everything that exists.

The workflow then moves to assignment. The estimator assigns labor. They assign materials.

They assign
assemblies. They assign quantities. They assign conditions.

They assign productivity factors. They assign
installation methods.

Assignment is not about detail. Assignment is about practicality.

The estimator must assign realistic labor and materials — not theoretical labor and materials.

The workflow then moves to adjustment. The estimator adjusts quantities. They adjust labor.

They adjust
assemblies. They adjust assumptions. They adjust productivity.

They adjust conditions. They adjust risk.

Adjustment is not about correction. Adjustment is about refinement.

The estimator must refine the estimate to reflect real world conditions.

The workflow then moves to summarization. The estimator reviews the totals. They review the labor.

They review
the materials. They review the equipment. They review the assemblies.

They review the conditions. They review
the risk. They review the profit.

Summarization is not about math. Summarization is about judgment.

The estimator must judge whether the number is reliable — not whether the number is perfect.

The workflow then moves to presentation. The estimator prepares the final number. They prepare the breakdown.

They prepare the alternates. They prepare the options. They prepare the clarifications.

They prepare the
exclusions. They prepare the proposal.

Presentation is not about detail. Presentation is about clarity.

The estimator must present a number that is clear, understandable, and defensible.

The workflow then moves to submission. The estimator submits the bid. They submit the proposal.

They submit the
breakdown. They submit the clarifications. They submit the exclusions.

Submission is not about speed. Submission is about confidence.

The estimator must submit a number they trust — not a number they hope is correct.

The workflow then moves to post analysis. The estimator reviews the results. They review the feedback.

They
review the competition. They review the pricing. They review the assumptions.

They review the mistakes. They
review the successes.

Post analysis is not about blame. Post analysis is about improvement.

The estimator must learn from every estimate — win or lose.

Understanding this workflow is essential for designing software that supports the estimator. Software must
align with the workflow. Software must enhance the workflow.

Software must simplify the workflow. Software must
accelerate the workflow. Software must clarify the workflow.

Software must not interrupt the workflow. Software must not complicate the workflow. Software must not slow the
workflow.

Software must not confuse the workflow. Software must not fight the workflow.

The estimator’s workflow is the backbone of estimating. Software must support the backbone — not bend it.

The workflow is built on balance. Balance between speed and accuracy. Balance between detail and simplicity.

Balance between freedom and structure. Balance between automation and control. Balance between power and
usability.

Balance between capability and cost.

Balance is everything.

Software that understands the estimator’s workflow will always outperform software that ignores it. Software
that supports the workflow will always feel natural. Software that aligns with the workflow will always feel
intuitive. Software that enhances the workflow will always feel powerful.

Software that fights the workflow will always fail.

The estimator’s workflow is the heart of estimating. Software must beat in rhythm with that heart.

Key Principle

The principle in this section is one of 30 that together form a complete philosophy of electrical estimating
— built from 50 years of real-world experience bidding and winning electrical work. Every principle connects
to every other. Master them together.

Managing electrical material costs to protect profit margins

Frequently Asked Questions

Questions electrical contractors ask about
electrical estimating material costs.

What does this principle mean for my daily estimating practice?
Every principle in this series translates directly to daily estimating decisions. The
concepts covered here affect how you set up assemblies, calibrate labor units, price materials, calculate
markup, and present your final number. Applying even one principle consistently improves the quality and
reliability of every estimate you produce.

How does electrical estimating material costs affect bid competitiveness?
Getting this right directly affects your ability to submit bids that are both accurate and
competitive. Contractors who understand and apply this principle consistently win more profitable work because
their numbers reflect reality — not guesswork, not padding, and not systematic error. Bid competitiveness is
ultimately a function of estimating discipline.

Does Best Bid Electrical Estimating Software support this approach?
Yes. Best Bid Next Generation was designed with all 30 principles in this series in mind.
Every feature, every assembly structure, every reporting tool reflects the philosophy Steve Griffin developed
over 50 years of real-world estimating. The software is the philosophy made practical.

How do I apply this to a real electrical project estimate?
Start by evaluating your current estimating process against the principle described in this
article. Identify where your workflow drifts away from the principle — whether in assembly calibration, labor
unit selection, overhead allocation, or markup calculation. Each gap is an opportunity to tighten your process
and protect your margin on the next bid.

Where can I read all 30 principles together?
All 30 sections are published together in the complete guide: The Art of Balance in Electrical Estimating Software. Reading
the full guide gives you the complete picture of how each principle connects to the others and why the whole
is greater than the sum of its parts.


How to Create a Professional Electrical Panel Schedule (With Software)

How to Create a Professional Electrical Panel Schedule – The Short Answer A professional electrical panel schedule lists every circuit in a panel by number, load name, amperage, breaker size, voltage, and phase. You can build one by hand on a spreadsheet, but electrical panel schedule software, like the Best Bid Panel Scheduler, lets you Read more about How to Create a Professional Electrical Panel Schedule (With Software)

How to Read Electrical Plans Without Printing Them

If you’ve ever rolled a full-size electrical plan across a conference table, grabbed three different colored highlighters, and started counting receptacles by hand, you already know the problem with this post. Every time you print a plan, highlight your symbols, total everything by hand, and then type those totals into your estimating software, you’ve opened Read more about How to Read Electrical Plans Without Printing Them